HOWO 15000L WATER TANK FIRE TRUCK

QDZ5310SG15 Firefighting Vehicle
2018-12-18
HOWO GAS SUPPLY FIRE TRUCK
2018-12-19
Show all

HOWO 15000L WATER TANK FIRE TRUCK

  1. Technical parameters
Model Parameters others
Overall Dimension 10400×2500×3580mm
GVW 32000kg
Engine Model D10.38-40
Engine Power 276KW
Wheelbase 4600+1350mm
Driving Type 6×4
Max.speed 90km/h
Emission Standard 9726ml Euro 4
Fire pump rated flow 50L/s@1.0Mpa;7L/s@4.0Mpa Vacuum pump
water monitor rated flow 50L/s@0.7MPa
Water monitor range Water range≥60m
Passengers 6
Approach angle ≥16°
Departure angle ≥12°

2.Fire performance parameters:

  Item                Parameters Parameters others
1 Water tank capacity water 15000kg
2 Fire pump model CB40.10/7.50-XZ
3 Fire pump performance Pressure1:1.0Mpa flow:50L/S

Pressure2:4.0Mpa flow:7L/S

Use vacuum pump to priming water
4 the installation site of fire pump rear
5 The quantity of fire pump water outlet 4
6 Pressure gauge  0-4.0 MPa 2.6 level
7 Vacuum gauge -0.1- 0.15 MPa 2.6 level
8

 

Water monitor

(PS50W)

Injection pressure ≥60m@0.7Mpa
 Depression/Elevation angle -30-+70°
Turning angle 360°
  1. Chassis

1、main parameters of the chassis:

Chassis No ZZ5347V4647D1 6×4  

 

 

Manufacturer China National Heavy Duty Truck Group Co., Ltd
Engine 276KW
Displacement 9726ml
Emission standards Euro 4
Wheel base 4600+1350mm
Maximum weight 32000kg
Highest speed 90 km/h

2、Cabin

Structure flat、4 doors、double row of seats
Passenger No 6
Drive type Left hand drive
 Equipment Besides original equipments on chassis,add:100W siren、long line fire lights、marker lamp、outline marker lamp、PTO and so on
Dashboard Speed/fuel/rotating speed dashboard  

 

 

 


III
. Upper bodywork

1.The Overall layout

The overall layout The front and two sides of the middle of the body are storage compartments. It is built-in type independent water tank in the middle position of the central compartment. The back of the body is pump compartment.
The aluminum alloy shutters are installed at both sides of the body and the back of the pump compartment, the ladders are installed on the back of the body at the right side.
Technological requirements All welding panels and skeleton steels are through strict process of anti-rust, anti-corrosion and phosphating pickling. All the accessories、standard components are processed of galvanization、electroplate、Dacromet treatments and so on. After completing welding of the tank, the tank will be clear up and removed possible defects such as empty solder. And then it will be through 24-hour hydrostatic test to assure no leakage.
The overall layout